Daily Summary

JUNE 2003

Previous page

DATE
WORK

Hours
Peter

Hours
Ian
Hours
Others
Daily
Total
Running
Total
Brought forward   215 235  2.5  - 452.5
01/06/03 Stbd wing prep 6 - - 6 458.5
02/06/03 ditto - 2.5 - 2.5 461
04/06/03 ditto 1.5 5 - 6.5 467.5
05/06/03 ditto 2 6.5 - 8.5 476
07/06/03 ditto 5 5   10 486
09/06/03 ditto - all the fiddly top skin lay ups - 3.5 - 3.5 489.5
11/06/03 Aileron linkage 2 1 - 3 492.5
12/06/03 Flap assembly 2 3 - 5 497.5
17/06/03 Aileron push rod 2.5 - - 2.5 500
18/06/03 Stall warner 1.5 4 - 5.5 505.5
19/06/03 Aileron adjustments 1.5 2.5 - 4 509.5
21/06/03 Tailplane trim tabs 6 6 - 12 521.5
23/01/03 Conduit for wing lights 2 4 - 6 527.5
25/06/03 Tailplanes 1.5 1.5 - 3 530.5
26/06/03 ditto - 2.5 - 2.5 533
27/06/03 ditto - 3 - 3 536
             
  TOTALS 248.5 285 2.5    