JULY 2003

Previous page

DATE
WORK

Hours
Peter

Hours
Ian
Hours
Others
Daily
Total
Running
Total
Brought forward   248.5 285  2.5  - 536
01/07/03 aileron mass balance 2 - - 2 538
02/07/03 tidy up both wings 2 4 - 6 544
03/07/03 mass balance boxes & PFA inspection 2.5 4 - 6.5 550.5
05/07/03 mass balance cutaways 2 - - 2 552.5
06/07/03 Trim hinges 5 5 - 10 562.5
08/07/03 ditto 2 - - 2 564.5
09/07/03 mass balance layups 2.5 5.5 - 8 572.5
14/07/03 trim connecting pins 2 4 - 6 578.5
20/07/03 rear bukhead 2.5 - - 2.5 581
21/07/03 ditto 1.5 - - 1.5 582.5
22/07/03 ditto 1 - - 1 583.5
31/07/03 Aileron mass balance - 3 - 3 586.5
             
  TOTALS 273.5 310.5 2.5    