Follow our progress
About the builders
Time Log of our progress
About Europa Aircraft
Get in touch with us
Our friends
 
 

Daily Summary

MAY 2003

Previous page

DATE
WORK

Hours
Peter

Hours
Ian
Hours
Others
Daily
Total
Running
Total
Brought forward   191.5 192 2.5  - 386
01/05/03 Wing re-inforcements 2.5 7   9.5 395.5
02/05/03 Aileron bell cranks - 6 - 6 401.5
03/05/03 Bell crank inspection plate, and push rod 4 3 - 7 408.5
07/05/03 Inspection hatch and pitot assembly 2 3.5 - 5.5 414
08/05/03 Pitot tube &aileron push rod 2 3   5 419
10/05/03 Fitting port aileron 7 7   14 433
12/05/03 Adjusting port aileron - 3   3 436
14/05/03 Made clips for pitot tube 1 - - 1 437
15/05/03 Flap assembly and pitot tube - 4.5 - 4.5 441.5
28/05/03 Trimmed flap 2 4   6 447.5
29/05/03 Fitted flap 3 2   5 452.5
  TOTALS 215 235 2.5    

Next page