Follow our progress
About the builders
Time Log of our progress
About Europa Aircraft
Get in touch with us
Our friends
 
 

Daily Summary

January 2003

Previous page

DATE
WORK

Hours
Peter

Hours
Ian
Hours
Others
Daily
Total
Running
Total
Brought forward   53.5 64.5 - 118
2/1/03
Remake aileron mass balance tabs
2 - - 2 120
3/1/03
Prepare and fix aileron hinges
- 5 - 5 125
4-5/1/03 Clear up workshop and rebuild tube rack. Make two mass balance tabs. 6 - - 6 131
7/1/03 Aileron hinges. Cockpit module thight supports. 3 4   7 138
8/1/03 Bonded plywood to thigh supports - 4   4 142
9/1/03 Plywood inserts for headrest base 2.5 -   2.5 144.5
10/1/03 Headrest base and visit to Woking to see Ian Rickard's plane. 4 4.5   8.5 153
11/1/03 Tried to calibrate resin pump. Cleaned up cockpit and assembled control columns. 0.5 4   4.5 157.5
12/1/03 Fixed resin pump 1.5 -   1.5 159
14/1/03 Cockpit module trimming 1.5 -   1.5 160.5
15/1/03 Control column assy/cockpit module 2 5   7 167.5
16/1/03 Cockpit module 1.5 -   1.5 169
19/1/03 Cockpit module 5 5   10 179
21/1/03 painted metal parts .5 4   4.5 183.5
22/1/03 cockpit module .5 -   .5 184
23/1/03 control stick/pitch tube 3 5   8 192
25/01/03 pitch tube anti corrosion 1 -   1 193
26/01/03 spray painting/cockpit module 1 4   5 198
29/01/03 Fuel tank assy - 3   3 201
31/01/03 Chocks Away paperwork 1 -   1 202
  TOTALS 90 112      

Next page