|
Daily Summary
February 2003
Previous
page
DATE |
WORK |
Hours
Peter |
Hours
Ian |
Hours
Others |
Daily
Total |
Running
Total |
Brought
forward |
|
90 |
112 |
- |
- |
202 |
01/02/03 |
Sanding cockpit module |
1.5 |
- |
- |
1.5 |
203.5 |
02/02/03 |
Autopilot prep |
6.5 |
5 |
|
11.5 |
215 |
03/02/03 |
Auto pilot fixings |
2.5 |
- |
- |
2.5 |
217.5 |
04/02/03 |
ditto |
3 |
- |
- |
3 |
220.5 |
05/02/03 |
Fuel guage assy |
- |
4 |
- |
4 |
224.5 |
06/02/03 |
Fuel tank and autopilot |
2 |
3 |
|
5 |
229.5 |
08/02/03 |
Autopilot bay |
6 |
6 |
|
12 |
241.5 |
09/02/03 |
Aileron torque tube |
1.5 |
- |
|
1.5 |
243 |
10/02/03 |
Adjusting torque tube/clearing up |
2 |
- |
- |
2 |
245 |
12/02/03 |
Bulkhead layup |
- |
4 |
|
4 |
249 |
13/02/03 |
Finished pitch torque tube |
2.5 |
4.5 |
|
7 |
256 |
15/02/03 |
Fuel tap inspection hatch |
1.5 |
1 |
|
2.5 |
258.5 |
17/02/03 |
Forward bulkhead |
- |
3 |
|
3 |
261.5 |
24/02/03 |
Forward bulkhead layup |
1 |
- |
|
1 |
262.5 |
25/02/03 |
ditto |
1 |
- |
|
1 |
263.5 |
26/02/03 |
Fuel valve |
2 |
- |
|
2 |
265.5 |
|
|
|
|
|
|
|
|
TOTALS |
123 |
142.5 |
|
|
|
Next page
|
|