|
Daily Summary
OCTOBER 2003
Previous
page
DATE |
WORK |
Hours
Peter |
Hours
Ian |
Hours
Others |
Daily
Total |
Running
Total |
Brought
forward |
|
354.5 |
405.5 |
14.5 |
- |
774.5 |
02/10/03 |
mass balance arm cables |
2 |
4 |
- |
6 |
780.5 |
04/10/03 |
set up for undercarriage |
6 |
5 |
- |
11 |
791.5 |
06/10/03 |
install brakes |
.5 |
3 |
- |
3.5 |
795 |
07/10/03 |
undercarriage holes and set up |
2.5 |
- |
- |
2.5 |
797.5 |
08/10/03 |
ditto |
2.5 |
- |
- |
2.5 |
800 |
09/10/03 |
bond straightedge to floor |
1.5 |
1.5 |
- |
3 |
803 |
10/10/03 |
bond u/c tubes |
1 |
1 |
- |
2 |
805 |
11/10/03 |
u/c ribs |
3 |
2 |
- |
5 |
810 |
13/10/03 |
ditto |
1 |
2 |
- |
3 |
813 |
14/10/03 |
u/c rib layups |
2 |
2 |
- |
4 |
817 |
16/10/03 |
ditto, plus wing inspection and misery |
3 |
2 |
- |
5 |
822 |
20/10/03 |
u/c ribs |
1 |
3 |
- |
4 |
826 |
21/10/03 |
ditto |
2 |
- |
- |
2 |
828 |
22/10/03 |
ditto |
3 |
2 |
- |
5 |
833 |
23/10/03 |
ditto |
2 |
- |
- |
2 |
835 |
25/10/03 |
rib lay ups |
- |
3 |
- |
3 |
838 |
27/10/03 |
ditto |
- |
2 |
- |
2 |
840 |
29/10/03 |
ditto |
- |
2 |
- |
2 |
842 |
31/10/03 |
ditto |
- |
2 |
- |
2 |
844 |
|
TOTALS |
387.5 |
442 |
14.5 |
|
|
Next page
|
|