Daily Summary

SEPTEMBER 2003

Previous page

DATE
WORK

Hours
Peter

Hours
Ian
Hours
Others
Daily
Total
Running
Total
Brought forward   315.5 357.5  12.5  - 685.5
01/09/03 Rudder pedal assembly 2 5 - 7 692.5
02/09/03 ditto plus main gear prep 1.5 3.5 - 5 697.5
04/09/03 Rudder floors 1.5 - - 1.5 699
06/09/03 Rudder floor dry layup 1.5 - - 1.5 700.5
07/09/03 Full layup- rudder floors 3.5 - 2 5.5 706
08/09/03 Refit rudder pedals 1 - - 1 707
09/09/03 ditto 1 - - 1 708
11/09/03 rear baggage bay internal layup 3 - - 3 711
13/09/03 ditto - port side - 3 - 3 714
15/09/03 Tailplane prep 1 3   4 718
16/09/03 ditto 3 5   8 726
18/09/03 rear bulkhead prep and instalation 2.5 4   6.5 732.5
19/09/03 ditto 1 - - 1 733.5
20/09/03 tail plane torque tube installation 4.5 4.5   9 742.5
21/09/03 ditto 1.5 - - 1.5 744
             
             
  TOTALS 344 385.5 14.5    